Tideway London 2017-2023

Super Sewer Project under Thames River Intermat 2018
Place: London, England
Link: Official site

Incite supplies fibre dosing systems to manufacture tunnel segments which are steel fibre concrete segemnts, to be constructed behind the TBM in this £5 billion project estimated to finish in year 2023.




North West Rail Link, Sydney 2018

North West Rail Link, 2013-2019 North West Rail, Australia 2014
Place: Sydney, Australia
Link: Official site

Incite is honoured to be chosen one of the suppliers in the North West Rail Link project in Sydney. Involving heavily in the consulting work, Incite is supplying dosing systems for both steel fibers and polypropelyne fibers which includes fiber doser, transport belt and bufferbelt for this construction project in Australia.




E4 Sthlm Bypass Project 2018~

The most imposing project in Nordic/Baltic
Cooperation
Place: Stockholm, Sweden
Link:press site

Incite supplies fibre dosing systems to build two main tunnels, two temporary ports, ramp tunnels and two working tunnels which represents the core of the E4 Stockholm Bypass Project. This construction is planned to stand ready in 2023.






 

 

 

Every batching plant has it's unique configuration. In most cases, Incite's dosing system requires only a stable ground base to achieve successful operation. Other cases, Incite provides also taylor-made consultancy to suit each and every client's needs.

Incite's equipment range includes fibredosing systems
for both steel and synthetic fibres, with a wide range of
dosing capacities to suit the individual needs of the customer.
Customized add-on equipments such as conveyors, blowers, elevators and vibrating feeders are also available. All equipments are
produced in accordance with CE- and EMC directives.


backbutton


Incite AB©2018 • All rights reserved

Head Office • Trehörningsv. 8, 31396 Simlångsdalen, Sweden • Tel.+46(0)35 218500 • Email: info@incite.se